A STRUCTURAL GROUP COMPANY

CONTACT US

HOME

PRODUCTS

TOTAL INSTALLED COST

INSTALLATIONS

RESOURCES / NEWS

TOTAL INSTALLED COST

Polyshield Reduces Total Installed Cost

Polyshield's simple construction and easy installation process drastically reduces the total installed cost compared to conventional fabricated steel baseplates.

Polyshield replaces:

  • Concrete foundation, brick linings and coatings.
  • Anchor bolts.
  • Metallic baseplate.
  • Grouting system.

Total Installation Savings:

  • Total time reduced from 1-2 weeks to 1-2 days for ANSI pumps.
  • 70-80% reduction of required craft man-hours.

Measureable Savings:

  • ANSI pump premount prior to installation
  • 1 to 2-day installation
  • Reduce number of installation steps
  • Fewer skilled craftsmen
  • Minimal edge forming
  • Use of 3000 psi (200 bar) concrete in place of expensive grouts
  • Avoidance of expensive acid brick foundations
  • No sandblasting to assure proper bonding.

Polyshield reduces Life Cycle Cost:

  • Improved equipment MTBPM
  • Reduced vibration
  • Excellent corrosion resistance
POLYSHIELD® RESOURCES
View our comprehensive collection of technical data, drawings, IOM's articles and brochures.

VISIT RESOURCES PAGE

POLYSHIELD® AWARDS
PLANT ENGINEERING
Product of the Year
Silver Award
Maintenance Products Category 1998

THE COMPOSITE INSTITUTE
Award of Excellence
Corrosion Resistant Equipment 1997

CHEMICAL PROCESSING
Vaaler Award
Maintenance Products Category 1991