Install Rebar Cage
|
Lower Polyshield over rebar cage
|
Install bottom edge forms
|
Pour regular 200 bar (3000 psi) concrete
|
INSTALLATIONS
Quick turnaround Time for Your Foundation/Baseplate Repair or New Rotating Equipment Installation
No need to keep your process or rotating equipment down for days. Polyshield can have you up and running in 24 hours. No concrete forms or the time it takes to cure. You save on time and labor on the initial installation and reap maintenance savings throughout the life cycle of the equipment. No corroding bases and no eroding concrete foundations.
Installation Services
Turn-key installation, concrete repair, and strengthening services provided by Structural Preservation Systems.
|
| POLYSHIELD® RESOURCES |
View our comprehensive collection of technical data, drawings, IOM's articles and brochures.
VISIT RESOURCES PAGE |
| POLYSHIELD® AWARDS |
|
PLANT ENGINEERING
Product of the Year
Silver Award
Maintenance Products Category 1998
THE COMPOSITE INSTITUTE
Award of Excellence
Corrosion Resistant Equipment 1997
CHEMICAL PROCESSING
Vaaler Award
Maintenance Products Category 1991
|
|