Polyshield Reduces Total Installed Cost
Polyshield's simple construction and easy installation process drastically reduces the total installed cost compared to conventional fabricated steel baseplates.
Polyshield replaces:
- Concrete foundation, brick linings and coatings.
- Anchor bolts.
- Metallic baseplate.
- Grouting system.
Total Installation Savings:
- Total time reduced from 1-2 weeks to 1-2 days for ANSI pumps.
- 70-80% reduction of required craft man-hours.
Measureable Savings:
- ANSI pump premount prior to installation
- 1 to 2-day installation
- Reduce number of installation steps
- Fewer skilled craftsmen
- Minimal edge forming
- Use of 3000 psi (200 bar) concrete in place of expensive grouts
- Avoidance of expensive acid brick foundations
- No sandblasting to assure proper bonding.
Polyshield reduces Life Cycle Cost:
- Improved equipment MTBPM
- Reduced vibration
- Excellent corrosion resistance