Polyshield Foundation and Baseplate System

Install Rebar Cage

Lower Polyshield over rebar cage

Install bottom edge forms

Pour regular 200 bar (3000 psi) concrete

Quick turnaround Time for Your Foundation/Baseplate Repair or New Rotating Equipment Installation

No need to keep your process or rotating equipment down for days. Polyshield can have you up and running in 24 hours. No concrete forms or the time it takes to cure. You save on time and labor on the initial installation and reap maintenance savings throughout the life cycle of the equipment. No corroding bases and no eroding concrete foundations.

Installation Services

Turn-key installation, concrete repair, and strengthening services provided by Structural Preservation Systems.

Contact Us Now!

Copyright 2010 PolyShield, LLC - A Structural Group Company